<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Power Line - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/tag/power-line/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/tag/power-line/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Mon, 28 Oct 2019 01:10:48 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Power Line - APD Engineering</title>
	<link>https://apdeng.com.au/tag/power-line/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION</title>
		<link>https://apdeng.com.au/yarnima-substation-to-newman-township-line-reconfiguration/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 28 Mar 2018 05:17:16 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Field Assessment]]></category>
		<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Poles]]></category>
		<category><![CDATA[Power Line]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Systems]]></category>
		<category><![CDATA[Towers]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4153</guid>

					<description><![CDATA[<p>Southern Cross Electrical Engineering (SCEE) engaged APD to do power line modelling and design for the 66kv reconfiguration outside of Yarnima Substation to the Newman township. We completed a field inspection determining the reconfiguration required additional poles and modification of loads to existing poles and towers be reassessed. APD then provided cost effective design solutions for the new power poles and modifications to the existing power poles and towers.</p>
<p>The post <a href="https://apdeng.com.au/yarnima-substation-to-newman-township-line-reconfiguration/">YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TRANSMISSION ASSESSMENT &#038; DESIGN FOR EARTH WIRE TO OPGW REPLACEMENT</title>
		<link>https://apdeng.com.au/transmission-assessment-design-for-earth-wire-to-opgw-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 31 Jul 2017 05:36:59 +0000</pubDate>
				<category><![CDATA[Auditing and Compliance]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Field Assessment]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Survey]]></category>
		<category><![CDATA[assessment]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Drafting]]></category>
		<category><![CDATA[PLS CADD]]></category>
		<category><![CDATA[PLS POLE]]></category>
		<category><![CDATA[PLS TOWER]]></category>
		<category><![CDATA[Power Line]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[tower]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=1751</guid>

					<description><![CDATA[<p>APD were contracted by ActewAGL to do a field survey, line assessment and detailed tower and pole designs as they intend to provide communications links between substations on their 132kV transmission network.</p>
<p>The post <a href="https://apdeng.com.au/transmission-assessment-design-for-earth-wire-to-opgw-replacement/">TRANSMISSION ASSESSMENT &#038; DESIGN FOR EARTH WIRE TO OPGW REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
