<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Earthing - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/apd-services-news/earthing/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/apd-services-news/earthing/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 05:57:05 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Earthing - APD Engineering</title>
	<link>https://apdeng.com.au/apd-services-news/earthing/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>GENERATOR PERFORMANCE STANDARD (GPS) REGISTRATION WITH AEMO!</title>
		<link>https://apdeng.com.au/generator-performance-standard-gps-registration-with-aemo/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 23 Jan 2024 05:57:05 +0000</pubDate>
				<category><![CDATA[Arc Flash]]></category>
		<category><![CDATA[Assessment Study]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Feasibility Studies]]></category>
		<category><![CDATA[Field Assessment]]></category>
		<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Protection]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=8741</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/generator-performance-standard-gps-registration-with-aemo/">GENERATOR PERFORMANCE STANDARD (GPS) REGISTRATION WITH AEMO!</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 21 Jun 2021 01:27:49 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Feasibility Studies]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Lightning Protection]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Protection]]></category>
		<category><![CDATA[Uncategorised]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[HV]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=7958</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:12:49 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Control Systems and Automation]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[EPC and EPCM]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Renewable Energy]]></category>
		<category><![CDATA[Solar]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Project management]]></category>
		<category><![CDATA[SCADA]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=7876</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Presentation on EMC Management for Substations</title>
		<link>https://apdeng.com.au/presentation-on-emc-management-for-substations/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 11 Apr 2019 06:51:29 +0000</pubDate>
				<category><![CDATA[APD Staff News]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Presentations]]></category>
		<category><![CDATA[Technology and Innovation]]></category>
		<category><![CDATA[Ashwin Maharaj]]></category>
		<category><![CDATA[EESA]]></category>
		<category><![CDATA[EMC]]></category>
		<category><![CDATA[Engineers Australia]]></category>
		<category><![CDATA[Management]]></category>
		<category><![CDATA[Perth]]></category>
		<category><![CDATA[Presentation]]></category>
		<category><![CDATA[Substations]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=6108</guid>

					<description><![CDATA[<p>APD Engineering's Ashwin Maharaj (FIEAust CPEng RPEQ) from our Adelaide office gave an engaging presentation on Tuesday night in Perth on EMC Management for Substations. Judging by the quality of the questions at the end it's a topic of interest. Thanks to Electric Energy Society of Australia (EESA), Engineers Australia (EA) and Western Power for the venue.</p>
<p>The post <a href="https://apdeng.com.au/presentation-on-emc-management-for-substations/">Presentation on EMC Management for Substations</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>POINT LOOKOUT WASTEWATER TREATMENT PLANT</title>
		<link>https://apdeng.com.au/point-lookout-wastewater-treatment-plant/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 19 Mar 2019 05:59:51 +0000</pubDate>
				<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Lightning Protection]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[Inspection]]></category>
		<category><![CDATA[Plant]]></category>
		<category><![CDATA[Point Lookout]]></category>
		<category><![CDATA[QLD]]></category>
		<category><![CDATA[Queensland]]></category>
		<category><![CDATA[Testing]]></category>
		<category><![CDATA[Treatment]]></category>
		<category><![CDATA[Wastewater]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=5329</guid>

					<description><![CDATA[<p>Visual inspection and testing of the lightning protection, earthing and bonding systems for the Point Lookout Wastewater Treatment Plant.</p>
<p>The post <a href="https://apdeng.com.au/point-lookout-wastewater-treatment-plant/">POINT LOOKOUT WASTEWATER TREATMENT PLANT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHAMBER SUBSTATION DESIGN FOR EATON APARTMENTS</title>
		<link>https://apdeng.com.au/chamber-substation-design-for-eaton-apartments/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 28 Nov 2018 06:46:48 +0000</pubDate>
				<category><![CDATA[ASP3 Design]]></category>
		<category><![CDATA[Contestable Design]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Field Assessment]]></category>
		<category><![CDATA[Land Development & Subdivisions]]></category>
		<category><![CDATA[ASP3]]></category>
		<category><![CDATA[Chamber Substation]]></category>
		<category><![CDATA[contestable]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[Eaton Apartments]]></category>
		<category><![CDATA[Newcastle]]></category>
		<category><![CDATA[NSW]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=5018</guid>

					<description><![CDATA[<p>APD Engineering were engaged to provide a certified electrical design for supply of Eaton Apartments in Wickham, Newcastle. A chamber substation was selected due to apparent space restrictions to site. Liaison with client, architect, structural engineers and site electricians was part of the process used to develop the final solution.</p>
<p>The post <a href="https://apdeng.com.au/chamber-substation-design-for-eaton-apartments/">CHAMBER SUBSTATION DESIGN FOR EATON APARTMENTS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 21 Aug 2018 04:03:22 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Reactor Switching]]></category>
		<category><![CDATA[South Australia]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=4491</guid>

					<description><![CDATA[<p>APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a href="https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/">INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RANGEWAY SUBSTATION TRANSFORMER DESIGN</title>
		<link>https://apdeng.com.au/western-power-rangeway-substation-third-transformer-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 03 Aug 2018 06:01:22 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Communications and Data]]></category>
		<category><![CDATA[Control Systems and Automation]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Lighting Design]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[civil]]></category>
		<category><![CDATA[E&I]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[structural]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Switchroom]]></category>
		<category><![CDATA[Telecommunications]]></category>
		<category><![CDATA[Transformer]]></category>
		<category><![CDATA[WA]]></category>
		<category><![CDATA[Western Power]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=4445</guid>

					<description><![CDATA[<p>APD were engaged by Western Power to complete detailed design &#038; drafting for the new transformer circuit &#038; switchroom at the Rangeway substation, Geraldton, WA</p>
<p>The post <a href="https://apdeng.com.au/western-power-rangeway-substation-third-transformer-design/">RANGEWAY SUBSTATION TRANSFORMER DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>DISTRIBUTION NETWORK ANALYSIS &#038; LINE DESIGN SERVICES</title>
		<link>https://apdeng.com.au/essential-energy-distribution-network-analysis-line-design-services/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 05 Jul 2018 05:30:39 +0000</pubDate>
				<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Soil Testing]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[Essential Energy]]></category>
		<category><![CDATA[Line Design]]></category>
		<category><![CDATA[NSW]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4398</guid>

					<description><![CDATA[<p>APD were engaged by Essential Energy to complete large packages of reinforcement works as part of their network maintenance. This included both overhead and underground design packages all over NSW.</p>
<p>The post <a href="https://apdeng.com.au/essential-energy-distribution-network-analysis-line-design-services/">DISTRIBUTION NETWORK ANALYSIS &#038; LINE DESIGN SERVICES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM</title>
		<link>https://apdeng.com.au/operation-centre-aeo-certification-for-earthing-system/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 24 Apr 2018 08:48:40 +0000</pubDate>
				<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[NSW]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Sydney]]></category>
		<category><![CDATA[Testing]]></category>
		<category><![CDATA[Trains]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4209</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/operation-centre-aeo-certification-for-earthing-system/">OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
