APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.
![INSULATION COORDINATION AND REACTOR SWITCHING STUDIES INSULATION COORDINATION AND REACTOR SWITCHING STUDIES](https://apdeng.com.au/wp-content/uploads/2018/08/INSULATION-COORDINATION-AND-REACTOR-SWITCHING-STUDIES.jpg)