Factory Acceptance Testing at our Perth Office
All set at APD Engineering for Factory Acceptance Testing of new protection relays to be integrating with an existing Power Management Scheme using IEC61850.
All set at APD Engineering for Factory Acceptance Testing of new protection relays to be integrating with an existing Power Management Scheme using IEC61850.
Visual inspection and testing of the lightning protection, earthing and bonding systems for the Point Lookout Wastewater Treatment Plant.
APD were engaged by Sydney Trains Construction Contractor, an Accredited Engineering Organisation (AEO) with earthing expertise, to provide assurance services for the earthing installation of the new Railway Operation Centre (ROC). ROC will form a critical part of the Sydney trains infrastructure, as the main hub for system controls, incident response and customer service.
Transgrid engaged APD Engineering to perform Testing & Commissioning (Primary, Secondary & SCADA) and Engineering support on the new Wallerawang 132kV / 66kV Substation, NSW. The Transmission Circuits that have been relocated and modified are assets of TransGrid, Essential Energy, Endeavour Energy and RailCorp.
APD were commissioned to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System at BHP Billiton Iron Ore Yandi Mine.
APD undertook the design to BHP requirements; automated processes development, testing and commissioning; construction support; site commissioning and project delivery.
APD was contracted by the Solomon Islands Electricity Authority for the replacement of failing relays and an upgrade of functionality to their existing system, improving the networks reliability and quality of power. APD’s scope of work was to review existing hardware and settings, perform bench testing of relays, commission new relays, update settings and provide training to SIEA staff.