<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Power System Studies - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/apd-services-news/power-system-studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/apd-services-news/power-system-studies/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Fri, 06 Aug 2021 07:49:23 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Power System Studies - APD Engineering</title>
	<link>https://apdeng.com.au/apd-services-news/power-system-studies/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>GENERATION COMPLIANCE TESTING &#038; MODEL VALIDATION</title>
		<link>https://apdeng.com.au/power-station-generation-compliance-testing-model-validation/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 06 Aug 2021 07:48:29 +0000</pubDate>
				<category><![CDATA[Auditing and Compliance]]></category>
		<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=8011</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/power-station-generation-compliance-testing-model-validation/">GENERATION COMPLIANCE TESTING &#038; MODEL VALIDATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>HV Distribution Upgrade of Titanium Dioxide Plant</title>
		<link>https://apdeng.com.au/hv-distribution-upgrade-of-titanium-dioxide-plant/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 30 Jan 2020 03:54:42 +0000</pubDate>
				<category><![CDATA[Arc Flash]]></category>
		<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Protection]]></category>
		<category><![CDATA[ARC Flash]]></category>
		<category><![CDATA[HV Switchboards]]></category>
		<category><![CDATA[LV Switchboards]]></category>
		<category><![CDATA[Power Systems Studies]]></category>
		<category><![CDATA[Relay Protection]]></category>
		<category><![CDATA[Titanium Dioxide]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=7468</guid>

					<description><![CDATA[<p>APD Engineering undertook power system studies, arc flash and protection scheme design associated with new 22kV HV Switchboards and 415V LV Switchboards as part of the HV Distribution Upgrade for a Titanium Dioxide Plant.</p>
<p>The post <a href="https://apdeng.com.au/hv-distribution-upgrade-of-titanium-dioxide-plant/">HV Distribution Upgrade of Titanium Dioxide Plant</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 21 Aug 2018 04:03:22 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Reactor Switching]]></category>
		<category><![CDATA[South Australia]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=4491</guid>

					<description><![CDATA[<p>APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a href="https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/">INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>COMPUTER MODELLING AND POWER SYSTEM STUDIES FOR FQM NICKEL MINE</title>
		<link>https://apdeng.com.au/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 12 Mar 2018 03:39:31 +0000</pubDate>
				<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Training]]></category>
		<category><![CDATA[Analysis]]></category>
		<category><![CDATA[Computer]]></category>
		<category><![CDATA[First Quantum Minerals]]></category>
		<category><![CDATA[FQM]]></category>
		<category><![CDATA[power]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Systems]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4123</guid>

					<description><![CDATA[<p>APD's Power System Studies team provided First Quantum Minerals (FQM) with end-to-end services from detailed site survey (data collection), through to computer modelling and system analyses.</p>
<p>The post <a href="https://apdeng.com.au/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/">COMPUTER MODELLING AND POWER SYSTEM STUDIES FOR FQM NICKEL MINE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WICKHAM ACCOMMODATION EXPANSION</title>
		<link>https://apdeng.com.au/wickham-accommodation-expansion/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 15 Jan 2018 02:14:48 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[nbn]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Soil Testing]]></category>
		<category><![CDATA[Survey]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4040</guid>

					<description><![CDATA[<p>APD Engineering were contracted by PLP to engineer and design  three new 1.5MVA and one 1MVA 11/0.433kV kiosk substations, powerline modifications and power and fibre optic cable reticulation for Rio Tinto Iron Ore's Wickham Accommodation Expansion.</p>
<p>The post <a href="https://apdeng.com.au/wickham-accommodation-expansion/">WICKHAM ACCOMMODATION EXPANSION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CSIRO MURCHISON RADIO-ASTRONOMY OBSERVATORY (MRO) – HV SUBMISSION</title>
		<link>https://apdeng.com.au/csiro-murchison-radio-astronomy-observatory-hv-submission/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 28 Aug 2017 06:06:40 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Horizon Power]]></category>
		<category><![CDATA[Muchison]]></category>
		<category><![CDATA[Network Modelling]]></category>
		<category><![CDATA[PSA Power System Studies]]></category>
		<category><![CDATA[Western Australia]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=3396</guid>

					<description><![CDATA[<p>APD were engaged by the CSIRO to conduct Power System Studies, Protection Grading Analysis, Earthing System Design &#038; Site Testing and prepare the HV Submission for the Network Operator, Horizon Power.</p>
<p>The post <a href="https://apdeng.com.au/csiro-murchison-radio-astronomy-observatory-hv-submission/">CSIRO MURCHISON RADIO-ASTRONOMY OBSERVATORY (MRO) – HV SUBMISSION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ARC FLASH ASSESSMENT FOR THE KIOSK SUB AND LV DISTRIBUTION BOARDS</title>
		<link>https://apdeng.com.au/arc-flash-assessment-for-the-kiosk-sub-and-lv-distribution-boards/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 21 Aug 2017 06:37:36 +0000</pubDate>
				<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[ARC Flash]]></category>
		<category><![CDATA[rio tinto]]></category>
		<category><![CDATA[Substations]]></category>
		<category><![CDATA[West Angelas]]></category>
		<category><![CDATA[Western Australia]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=3403</guid>

					<description><![CDATA[<p>APD were contracted by Rio Tinto to carry out detailed protection studies on the HV kiosk sub and downstream LV DBs, and assess the potential hazard to personnel due to the occurrence of an Arc Flash as part of the incorporation of the new substation into the West Angelas electrical network.</p>
<p>The post <a href="https://apdeng.com.au/arc-flash-assessment-for-the-kiosk-sub-and-lv-distribution-boards/">ARC FLASH ASSESSMENT FOR THE KIOSK SUB AND LV DISTRIBUTION BOARDS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
