<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Lightning Protection - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/earthing-design/lightning-protection/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/lightning-protection/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 00:51:18 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Lightning Protection - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/lightning-protection/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 04:45:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7948</guid>

					<description><![CDATA[<p>APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network &#038; determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.</p>
<p>The post <a href="https://apdeng.com.au/project/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WASTEWATER TREATMENT PLANT EARTHING AND LIGHTNING PROTECTION TESTING</title>
		<link>https://apdeng.com.au/project/wastewater-treatment-plant-earthing-and-lightning-protection-testing/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 19 Mar 2019 05:56:18 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=5330</guid>

					<description><![CDATA[<p>Visual inspection and testing of the lightning protection, earthing and bonding systems for the Point Lookout Wastewater Treatment Plant. The project came about due to multiple instrument and electric motor failures, attributed to insufficient earthing of the instruments.</p>
<p>The post <a href="https://apdeng.com.au/project/wastewater-treatment-plant-earthing-and-lightning-protection-testing/">WASTEWATER TREATMENT PLANT EARTHING AND LIGHTNING PROTECTION TESTING</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
