<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>earthing &#8211; APD Engineering</title>
	<atom:link href="https://apdeng.com.au/tag/earthing/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au</link>
	<description>Australian Electrical Power Designers &#38; Consultants</description>
	<lastBuildDate>Mon, 28 Oct 2019 01:10:56 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.3.2</generator>
	<item>
		<title>INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/</link>
				<pubDate>Tue, 21 Aug 2018 04:03:22 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Reactor Switching]]></category>
		<category><![CDATA[South Australia]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Substation]]></category>

		<guid isPermaLink="false">https://apdeng.com.au/?p=4491</guid>
				<description><![CDATA[<p>APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/">INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM</title>
		<link>https://apdeng.com.au/operation-centre-aeo-certification-for-earthing-system/</link>
				<pubDate>Tue, 24 Apr 2018 08:48:40 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[NSW]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Sydney]]></category>
		<category><![CDATA[Testing]]></category>
		<category><![CDATA[Trains]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=4209</guid>
				<description><![CDATA[<p>The post <a rel="nofollow" href="https://apdeng.com.au/operation-centre-aeo-certification-for-earthing-system/">OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>SARACEN MINERALS POWERLINE WORKS</title>
		<link>https://apdeng.com.au/saracen-minerals-powerline-works/</link>
				<pubDate>Tue, 17 Oct 2017 08:55:40 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[EPC and EPCM]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[Asset relocation]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[EPC]]></category>
		<category><![CDATA[Financial Management]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=3354</guid>
				<description><![CDATA[<p>As part of the re-start of the operations at Thunderbox mine, APD was engaged to undertake powerline modification and upgrade works for Saracen Minerals Holdings. This included undergrounding of existing 11kv overhead assets, installation of a new 315kV transformer, earthing, soil testing and maintenance / repairs on other existing infrastructure. </p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/saracen-minerals-powerline-works/">SARACEN MINERALS POWERLINE WORKS</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>PERTH CBD ZONE SUBSTATIONS EARTHING DESIGN &#038; TESTING</title>
		<link>https://apdeng.com.au/perth-cbd-zone-substations-earthing-design-and-testing/</link>
				<pubDate>Mon, 04 Sep 2017 04:02:08 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Soil Testing]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[Cost Estimation]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Perth]]></category>
		<category><![CDATA[Substations]]></category>
		<category><![CDATA[Western Australia]]></category>
		<category><![CDATA[Western Power]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=3387</guid>
				<description><![CDATA[<p>APD was commissioned by Western Power to perform a Site Inspection, Earthing Design &#038; Drawings, EPR Hazard Assessment on 3rd Party Assets and Current Injection Testing in the Perth CBD, WA. This is in preparation for a new 132kV underground cable planned for installation between two key zone substations.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/perth-cbd-zone-substations-earthing-design-and-testing/">PERTH CBD ZONE SUBSTATIONS EARTHING DESIGN &#038; TESTING</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>CSIRO MURCHISON RADIO-ASTRONOMY OBSERVATORY (MRO) – HV SUBMISSION</title>
		<link>https://apdeng.com.au/csiro-murchison-radio-astronomy-observatory-hv-submission/</link>
				<pubDate>Mon, 28 Aug 2017 06:06:40 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Horizon Power]]></category>
		<category><![CDATA[Muchison]]></category>
		<category><![CDATA[Network Modelling]]></category>
		<category><![CDATA[PSA Power System Studies]]></category>
		<category><![CDATA[Western Australia]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=3396</guid>
				<description><![CDATA[<p>APD were engaged by the CSIRO to conduct Power System Studies, Protection Grading Analysis, Earthing System Design &#038; Site Testing and prepare the HV Submission for the Network Operator, Horizon Power.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/csiro-murchison-radio-astronomy-observatory-hv-submission/">CSIRO MURCHISON RADIO-ASTRONOMY OBSERVATORY (MRO) – HV SUBMISSION</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
	</channel>
</rss>
