<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Studies &#8211; APD Engineering</title>
	<atom:link href="https://apdeng.com.au/tag/studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au</link>
	<description>Australian Electrical Power Designers &#38; Consultants</description>
	<lastBuildDate>Mon, 28 Oct 2019 01:10:56 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.3.2</generator>
	<item>
		<title>INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/</link>
				<pubDate>Tue, 21 Aug 2018 04:03:22 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Reactor Switching]]></category>
		<category><![CDATA[South Australia]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Substation]]></category>

		<guid isPermaLink="false">https://apdeng.com.au/?p=4491</guid>
				<description><![CDATA[<p>APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/">INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION</title>
		<link>https://apdeng.com.au/yarnima-substation-to-newman-township-line-reconfiguration/</link>
				<pubDate>Wed, 28 Mar 2018 05:17:16 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Field Assessment]]></category>
		<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Poles]]></category>
		<category><![CDATA[Power Line]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Systems]]></category>
		<category><![CDATA[Towers]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=4153</guid>
				<description><![CDATA[<p>Southern Cross Electrical Engineering (SCEE) engaged APD to do power line modelling and design for the 66kv reconfiguration outside of Yarnima Substation to the Newman township. We completed a field inspection determining the reconfiguration required additional poles and modification of loads to existing poles and towers be reassessed. APD then provided cost effective design solutions for the new power poles and modifications to the existing power poles and towers.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/yarnima-substation-to-newman-township-line-reconfiguration/">YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
		<item>
		<title>COMPUTER MODELLING AND POWER SYSTEM STUDIES FOR FQM NICKEL MINE</title>
		<link>https://apdeng.com.au/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/</link>
				<pubDate>Mon, 12 Mar 2018 03:39:31 +0000</pubDate>
		<dc:creator><![CDATA[APD_Karl]]></dc:creator>
				<category><![CDATA[Modelling]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Training]]></category>
		<category><![CDATA[Analysis]]></category>
		<category><![CDATA[Computer]]></category>
		<category><![CDATA[First Quantum Minerals]]></category>
		<category><![CDATA[FQM]]></category>
		<category><![CDATA[power]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Systems]]></category>

		<guid isPermaLink="false">http://apdeng.com.au/?p=4123</guid>
				<description><![CDATA[<p>APD's Power System Studies team provided First Quantum Minerals (FQM) with end-to-end services from detailed site survey (data collection), through to computer modelling and system analyses.</p>
<p>The post <a rel="nofollow" href="https://apdeng.com.au/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/">COMPUTER MODELLING AND POWER SYSTEM STUDIES FOR FQM NICKEL MINE</a> appeared first on <a rel="nofollow" href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
									</item>
	</channel>
</rss>
