<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Substation - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/tag/substation/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/tag/substation/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 22 Jun 2021 06:47:06 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Substation - APD Engineering</title>
	<link>https://apdeng.com.au/tag/substation/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 21 Jun 2021 01:27:49 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Feasibility Studies]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Lightning Protection]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Protection]]></category>
		<category><![CDATA[Uncategorised]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[HV]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=7958</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RELOCATING CONTROL CENTRE &#8211; SUBSTATIONS UPGRADES</title>
		<link>https://apdeng.com.au/relocating-control-centre-substations-upgrades/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 01 Apr 2019 08:10:54 +0000</pubDate>
				<category><![CDATA[Communications and Data]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Technology and Innovation]]></category>
		<category><![CDATA[Control Centre]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Perth]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Telecommunications]]></category>
		<category><![CDATA[Western Australia]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=5402</guid>

					<description><![CDATA[<p>As part of relocating Western Power’s electrical network control centre, APD Engineering were engaged to do design and drafting for upgrades to the telecommunication infrastructure at several of their substations.</p>
<p>The post <a href="https://apdeng.com.au/relocating-control-centre-substations-upgrades/">RELOCATING CONTROL CENTRE &#8211; SUBSTATIONS UPGRADES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 21 Aug 2018 04:03:22 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[Power Line Design]]></category>
		<category><![CDATA[Power System Studies]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[earthing]]></category>
		<category><![CDATA[Insulation]]></category>
		<category><![CDATA[Reactor Switching]]></category>
		<category><![CDATA[South Australia]]></category>
		<category><![CDATA[Studies]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=4491</guid>

					<description><![CDATA[<p>APD Engineering were engaged by ElectraNet to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a href="https://apdeng.com.au/insulation-coordination-and-reactor-switching-studies/">INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RANGEWAY SUBSTATION TRANSFORMER DESIGN</title>
		<link>https://apdeng.com.au/western-power-rangeway-substation-third-transformer-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 03 Aug 2018 06:01:22 +0000</pubDate>
				<category><![CDATA[Civil and Structural]]></category>
		<category><![CDATA[Communications and Data]]></category>
		<category><![CDATA[Control Systems and Automation]]></category>
		<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[Earthing]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Lighting Design]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[civil]]></category>
		<category><![CDATA[E&I]]></category>
		<category><![CDATA[Earthing Design]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[structural]]></category>
		<category><![CDATA[Substation]]></category>
		<category><![CDATA[Switchroom]]></category>
		<category><![CDATA[Telecommunications]]></category>
		<category><![CDATA[Transformer]]></category>
		<category><![CDATA[WA]]></category>
		<category><![CDATA[Western Power]]></category>
		<guid isPermaLink="false">https://apdeng.com.au/?p=4445</guid>

					<description><![CDATA[<p>APD were engaged by Western Power to complete detailed design &#038; drafting for the new transformer circuit &#038; switchroom at the Rangeway substation, Geraldton, WA</p>
<p>The post <a href="https://apdeng.com.au/western-power-rangeway-substation-third-transformer-design/">RANGEWAY SUBSTATION TRANSFORMER DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>BHP Southtown Substation Design</title>
		<link>https://apdeng.com.au/bhp-southtown-substation-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 23 Jan 2018 01:44:09 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Communications]]></category>
		<category><![CDATA[SCADA]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4063</guid>

					<description><![CDATA[<p>APD Engineering were contracted by Southern Cross Electrical Engineering for the development of the electrical, SCADA and communications design of the new 66/11kV BHP Southtown Substation in Newman, Western Australia.</p>
<p>The post <a href="https://apdeng.com.au/bhp-southtown-substation-design/">BHP Southtown Substation Design</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MINING AREA C GROWTH REACTIVE SUPPORT</title>
		<link>https://apdeng.com.au/mining-area-c-growth-reactive-support/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 08 Jan 2018 05:16:43 +0000</pubDate>
				<category><![CDATA[Detailed Design]]></category>
		<category><![CDATA[HV Substations]]></category>
		<category><![CDATA[Reporting]]></category>
		<category><![CDATA[Testing and Commissioning]]></category>
		<category><![CDATA[Analysis]]></category>
		<category><![CDATA[BHP]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[Cost Estimation]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Substation]]></category>
		<guid isPermaLink="false">http://apdeng.com.au/?p=4024</guid>

					<description><![CDATA[<p>APD Engineering were engaged by BHP to deliver a Class 4 Desktop-level Cost Estimate (Turnkey delivery model) for two identified sites. Once an option was agreed APD produced a detailed design package for installation of the capacitor bank. The detailed design package included primary, civil and secondary design.</p>
<p>The post <a href="https://apdeng.com.au/mining-area-c-growth-reactive-support/">MINING AREA C GROWTH REACTIVE SUPPORT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>