APD Engineering were engaged by BHP to deliver a Class 4 Desktop-level Cost Estimate (Turnkey delivery model) for two identified sites. Once an option was agreed APD produced a detailed design package for installation of the capacitor bank. The detailed design package included primary, civil and secondary design.
![CS_W_APD05200_Yandi_Substation_BHP Yandi Substation BHP MINE AREA C GROWTH REACTIVE SUPPORT](https://apdeng.com.au/wp-content/uploads/2018/01/CS_W_APD05200_Yandi_Substation_BHP.jpg)