<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Electrical &amp; Instrumentation - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/electrical-instrumentation/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/electrical-instrumentation/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 02:09:33 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Electrical &amp; Instrumentation - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/electrical-instrumentation/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>MAC TLO WORKING PLATFORM SLIDING GATE CONTROL INTEGRATION</title>
		<link>https://apdeng.com.au/project/mac-tlo-working-platform-sliding-gate-control-integration/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 30 Oct 2018 03:49:08 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4942</guid>

					<description><![CDATA[<p>APD Engineering was hired to perform the control system integration of the MAC TLO Working Platform Sliding Gate.</p>
<p>The post <a href="https://apdeng.com.au/project/mac-tlo-working-platform-sliding-gate-control-integration/">MAC TLO WORKING PLATFORM SLIDING GATE CONTROL INTEGRATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MT WHALEBACK SUBSTATION PLANT REPLACEMENT</title>
		<link>https://apdeng.com.au/project/mt-whaleback-substation-plant-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 03 Oct 2018 07:11:09 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4789</guid>

					<description><![CDATA[<p>66kV Mt Whaleback Substation Plant Replacement.</p>
<p>The post <a href="https://apdeng.com.au/project/mt-whaleback-substation-plant-replacement/">MT WHALEBACK SUBSTATION PLANT REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</title>
		<link>https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 14 Aug 2018 02:55:54 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4481</guid>

					<description><![CDATA[<p>33kV Junction Capacitor circuit breaker, CT and controller replacement.</p>
<p>The post <a href="https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/">33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RANGEWAY SUBSTATION THIRD TRANSFORMER</title>
		<link>https://apdeng.com.au/project/rangeway-substation-third-transformer/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 03 Aug 2018 05:09:14 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4442</guid>

					<description><![CDATA[<p>APD were engaged by Western Power to complete detailed design &#038; drafting for the new transformer circuit &#038; switchroom at the Rangeway substation, Geraldton, WA</p>
<p>The post <a href="https://apdeng.com.au/project/rangeway-substation-third-transformer/">RANGEWAY SUBSTATION THIRD TRANSFORMER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MARRIOTT ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/marriott-road-substation-communications-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 06:23:52 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4356</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/marriott-road-substation-communications-and-scada-design/">MARRIOTT ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MASON ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/mason-road-substation-communications-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 06:02:07 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4353</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/mason-road-substation-communications-and-scada-design/">MASON ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WANGARA SUBSTATION SCADA AND COMMUNICATIONS</title>
		<link>https://apdeng.com.au/project/wangara-substation-scada-and-communications/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 04:36:42 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4350</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/wangara-substation-scada-and-communications/">WANGARA SUBSTATION SCADA AND COMMUNICATIONS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WAIKIKI SUBSTATION COMMUNICATIONS AND SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/waikiki-substation-communications-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 04:22:16 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4346</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for new 132/22kV Transformer and switchroom project.</p>
<p>The post <a href="https://apdeng.com.au/project/waikiki-substation-communications-and-scada-design/">WAIKIKI SUBSTATION COMMUNICATIONS AND SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ALINTA LINE RECONFIGURATION SECONDARY SCOPE</title>
		<link>https://apdeng.com.au/project/alinta-line-reconfiguration-secondary-scope/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 12 Jun 2018 06:12:29 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4291</guid>

					<description><![CDATA[<p>Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.</p>
<p>The post <a href="https://apdeng.com.au/project/alinta-line-reconfiguration-secondary-scope/">ALINTA LINE RECONFIGURATION SECONDARY SCOPE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION</title>
		<link>https://apdeng.com.au/project/nammuldi-agricultural-project-pivot-control-system-simplification/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 23 Oct 2017 05:14:27 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3486</guid>

					<description><![CDATA[<p>Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.</p>
<p>The post <a href="https://apdeng.com.au/project/nammuldi-agricultural-project-pivot-control-system-simplification/">NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
