CSIRO MURCHISON RADIO-ASTRONOMY OBSERVATORY (MRO) – HV SUBMISSION
APD were engaged by the CSIRO to conduct Power System Studies, Protection Grading Analysis, Earthing System Design & Site Testing and prepare the HV Submission for the Network Operator, Horizon Power.