MARRIOTT ROAD SUBSTATION COMMUNICATIONS & SCADA DESIGN
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
APD Engineering have complete electrical and instrumentation (E&I), controls and communications capability that complement our broader electrical power and civil engineering services. We provide services to clients in the mining, oil & gas, infrastructure and power generation sectors utilising our team of qualified and experienced E&I personnel.
APD complete these works stand alone or seamlessly integrate with civil and SMP partners. Pre-commissioning and commissioning support ensures safe & efficient energization through appropriate engineering controls and processes.
We have the capability to work with OEM providers and their respective teams to ensure wiring compliance with AS3000 and client specific requirements. Our electrical and Instrumentation personnel provide constructability input at early stages of project development to ensure time and cost savings during execution as well as mitigate risk.
APD’s HV, hazardous area, telecommunications and technical services expertise helps create and capture benefits for our clients through the asset value chain, from design through to operations.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP…
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for new 132/22kV Transformer and switchroom project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
APD were engaged by Western Power to complete detailed design & drafting for the new transformer circuit & switchroom at the Rangeway substation, Geraldton, WA
APD Engineering was hired to perform the control system integration of the MAC TLO Working Platform Sliding Gate.