GULLEN RANGE WIND FARM
APD Engineering provided Detailed Design and Foundation Assessment for the Gullen Range Wind Farm.
APD’s engineers specialise in the design and commissioning of wind farms with collector systems that minimize electrical losses while performing reliably and safely. From the wind turbine foundation to the utility tie-in point, and supported by our significant experience in HV substations and earthing,
APD Engineering provided Detailed Design and Foundation Assessment for the Gullen Range Wind Farm.
Prepare and verify a DIgSILENT PowerFactory dynamic model representing the 80MW Emu Downs site consisting of 48 Vestas Wind Turbine Generators (WTG), substation and interconnection to the 132kV grid.