<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Substation Design - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/substation-design/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/substation-design/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 01:19:12 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Substation Design - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/substation-design/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>SNAPPER POINT CONNECTION</title>
		<link>https://apdeng.com.au/project/snapper-point-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 18 May 2022 04:41:29 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8159</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/snapper-point-connection/">SNAPPER POINT CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>UNIT ASSET REPLACEMENT (UAR) PROJECT</title>
		<link>https://apdeng.com.au/project/unit-asset-replacement-uar-project/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 10 Feb 2022 05:33:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8082</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/unit-asset-replacement-uar-project/">UNIT ASSET REPLACEMENT (UAR) PROJECT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 04:45:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7948</guid>

					<description><![CDATA[<p>APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network &#038; determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.</p>
<p>The post <a href="https://apdeng.com.au/project/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/project/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:31:07 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7884</guid>

					<description><![CDATA[<p>APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>PERNATTY SUBSTATION ELECTROMAGNETIC FIELDS (EMF) STUDY</title>
		<link>https://apdeng.com.au/project/pernatty-substation-electromagnetic-fields-study/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 11 Feb 2020 07:09:15 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7541</guid>

					<description><![CDATA[<p>APD Engineering conducted an Electromagnetic Fields (EMF) Study of Pernatty substation in South Australia for human health considerations.</p>
<p>The post <a href="https://apdeng.com.au/project/pernatty-substation-electromagnetic-fields-study/">PERNATTY SUBSTATION ELECTROMAGNETIC FIELDS (EMF) STUDY</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SUBSTATIONS UPGRADES FOR RELOCATING CONTROL CENTRE</title>
		<link>https://apdeng.com.au/project/substations-upgrades-for-relocating-control-centre__trashed/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 01 Apr 2019 04:14:44 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=5403</guid>

					<description><![CDATA[<p>As part of relocating Western Power’s electrical network control centre, APD Engineering were engaged to do design and drafting for upgrades to the telecommunication infrastructure at several of their substations.</p>
<p>The post <a href="https://apdeng.com.au/project/substations-upgrades-for-relocating-control-centre__trashed/">SUBSTATIONS UPGRADES FOR RELOCATING CONTROL CENTRE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>EATON APARTMENTS CHAMBER SUBSTATION DESIGN</title>
		<link>https://apdeng.com.au/project/eaton-apartments-chamber-substation-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 28 Nov 2018 06:38:04 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=5015</guid>

					<description><![CDATA[<p>APD Engineering were engaged to provide a certified electrical design for supply of Eaton Apartments in Wickham, Newcastle. A chamber substation was selected due to apparent space restrictions to site. Liaison with client, architect, structural engineers and site electricians was part of the process used to develop the final solution.</p>
<p>The post <a href="https://apdeng.com.au/project/eaton-apartments-chamber-substation-design/">EATON APARTMENTS CHAMBER SUBSTATION DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SILVERGRASS EAST HV SUBSTATION SCADA DESIGN AND COMMISSIONING</title>
		<link>https://apdeng.com.au/project/silvergrass-east-hv-substation-scada-design-and-commissioning/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 30 Oct 2018 03:32:23 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4940</guid>

					<description><![CDATA[<p>APD Engineering performed detailed HV substation SCADA design of the RTU panels for each substation, RTU &#038; HMI development, testing &#038; site commissioning.</p>
<p>The post <a href="https://apdeng.com.au/project/silvergrass-east-hv-substation-scada-design-and-commissioning/">SILVERGRASS EAST HV SUBSTATION SCADA DESIGN AND COMMISSIONING</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ASSET REPLACEMENT PROJECT SUBSTATION SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/asset-replacement-project-substation-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 29 Oct 2018 04:01:17 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4937</guid>

					<description><![CDATA[<p>Detailed design associated with the replacement of transmission assets identified in Picton 22kV, Bridgetown, Bunbury Harbour and Busselton substations.</p>
<p>The post <a href="https://apdeng.com.au/project/asset-replacement-project-substation-scada-design/">ASSET REPLACEMENT PROJECT SUBSTATION SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>BADGINGARRA WIND FARM SUBSTATION SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/badgingarra-wind-farm-substation-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 26 Oct 2018 08:33:42 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4928</guid>

					<description><![CDATA[<p>APD were hired to perform civil, structural, primary, secondary, protection, automation, communications &#038; SCADA design for the Badgingarra Wind Farm Substation</p>
<p>The post <a href="https://apdeng.com.au/project/badgingarra-wind-farm-substation-scada-design/">BADGINGARRA WIND FARM SUBSTATION SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
