YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION
Southern Cross Electrical Engineering (SCEE) engaged APD to do power line modelling and design for the 66kv reconfiguration outside of Yarnima Substation to the Newman township. We completed a field inspection determining the reconfiguration required additional poles and modification of loads to existing poles and towers be reassessed. APD then provided cost effective design solutions for the new power poles and modifications to the existing power poles and towers.