APD Engineering have been providing Specialist Electrical Engineering Detailed Design and Consultancy Services to Power Utilities, Local Government Authorities, Land Developers, Mining, Construction and other industries for over 20 years.
APD Engineering is proud to announce our appointment to the Transpower Lines Full Design Panel. A few years ago, we were inspired by Transpower’s vision and strategy as set out by Whakamana i Te Mauri Hiko and established our New Zealand operation to serve the electricity industry with special focus on Transpower. Our recent achievement…
APD is excited to announce the successful completion of the first Satellite Backhaul Upgrade site for our client in regional WA. It demonstrates our client’s innovative approach to customer service for regional communities, to improve connectivity and better internet access. APD Engineering proudly delivered the full Design & Construct of this site. We thank our…
The 28.6 MW Waste to Energy plant is situated in East Rockingham, WA and is designed to deliver a cost-effective waste treatment solution and source of dispatchable renewable energy, whilst achieving a 96% diversion of residual waste from landfill. It connects to the grid via Western Power’s Office Rd 132kV (OFE) substation, a greenfield substation…
Synergy’s Collie & Muja Power Stations are situated in South West region of Western Australia and are subject to the Wholesale Electricity Market (WEM) Reform work program, which required the upgrade of the substation automation systems at these sites, to enable real-time market-driven controls from the Independent Systems Operator, AEMO, to be implemented. Western Power…
TNU initiated developing the Snapper Point Power Station at Harbor, SA and the works involved relocation of five generators. The new power station is to operate as a peaking plant primarily operating on natural gas but can switch to liquid fuel. APD Engineering was engaged by Enerven / ElectraNet to provide Detailed Design Services for…
APD Engineering are excited to announce our selection as an Approved Consultant on Transpower’s Advisory Panel for Transmission Lines. This is a great acknowledgement for our highly motivated ANZ team. This achievement re-affirms our commitment to providing the highest quality power engineering design and consultancy services, to fulfill our customers’ requirements, whilst ensuring safety for…
ElectraNet initiated a Unit Asset Replacement (UAR) for the regulatory period 2018-2023 involving substation asset replacement. APD Engineering was engaged by Enerven to produce the design for the UAR project at five substations namely; Blanche, Mt Gambier, Mayurra, Penola West and South East.
APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study & assess the local network & determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station. It will be Australia’s first net-zero emissions plant, which will use…
APD Engineering conducted an Electromagnetic Fields Study (EMF) of Pernatty substation in South Australia for human health considerations.
APD Engineering was engaged by CSI for the detailed design, development, testing, SCADA commissioning & integration into the SAPN network of the Mannum Solar Farm – Stage 1.