APD has the capability to deliver all of the required components that are essential to the best and correct integration of large scale wind and solar renewable energy power stations.
The Pluto Solar Import Project will incorporate a 50 MW Solar Farm at Maitland Strategic Industrial Estate (Maitland), a Transmission and Distribution system from the Solar Farm to the Pluto LNG Park and the additions and modifications at the Pluto site to allow the import of external power into the auxiliary power grid, displacing some…
The 28.6 MW Waste to Energy plant is situated in East Rockingham, WA and is designed to deliver a cost-effective waste treatment solution and source of dispatchable renewable energy, whilst achieving a 96% diversion of residual waste from landfill. It connects to the grid via Western Power’s Office Rd 132kV (OFE) substation, a greenfield substation…
APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm. The Chichester Solar Project consisted of a 60MW solar PV power station located in the Pilbara region. The project also included 64km of 220kV transmission line, two new 220kV substations at Christmas Creek and Cloudbreak and an expansion…
APD Engineering was engaged by CSI for the detailed design, development, testing, SCADA commissioning & integration into the SAPN network of the Mannum Solar Farm – Stage 1.
Getting Paid to Use Less Energy – This was posted in Arena Wire: “The Australian summer is coming and so is demand response. Here’s how it will work.”