<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Automation &amp; SCADA - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/automation-scada/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/automation-scada/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 01:13:50 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Automation &amp; SCADA - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/automation-scada/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/east-rockingham-waste-to-energy-generator-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 06 Feb 2023 02:08:03 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8366</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/east-rockingham-waste-to-energy-generator-grid-connection/">EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>COLLIE &#038; MUJA POWER STATIONS WEM REFORM SUBSTATION AUTOMATION UPGRADE</title>
		<link>https://apdeng.com.au/project/collie-muja-power-stations-wem-reform-substation-automation-upgrade/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 10 Nov 2022 02:11:13 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8326</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/collie-muja-power-stations-wem-reform-substation-automation-upgrade/">COLLIE &#038; MUJA POWER STATIONS WEM REFORM SUBSTATION AUTOMATION UPGRADE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 04:45:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7948</guid>

					<description><![CDATA[<p>APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network &#038; determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.</p>
<p>The post <a href="https://apdeng.com.au/project/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/project/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:31:07 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7884</guid>

					<description><![CDATA[<p>APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TRANSGRID BERRYBANK WIND FARM SUBSTATION AND SWITCHING STATION AUTOMATION</title>
		<link>https://apdeng.com.au/project/transgrid-berrybank-wind-farm-substation-and-switching-station-automation/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 24 Sep 2020 03:32:22 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7819</guid>

					<description><![CDATA[<p>APD Engineering was engaged by TransGrid, to provide the automation configuration, testing &#038; commissioning support works, for the greenfield Berrybank wind farm connection substation and switching station.</p>
<p>The post <a href="https://apdeng.com.au/project/transgrid-berrybank-wind-farm-substation-and-switching-station-automation/">TRANSGRID BERRYBANK WIND FARM SUBSTATION AND SWITCHING STATION AUTOMATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SOLAR FARM COMMISSIONING AND INTEGRATION INTO SAPN NETWORK</title>
		<link>https://apdeng.com.au/project/solar-farm-commissioning-and-integration-into-sapn-network/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 15 Nov 2019 02:52:08 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6991</guid>

					<description><![CDATA[<p>APD Engineering was engaged by CSI for the detailed design, development, testing, SCADA commissioning &#038; integration into the SAPN network of the Mannum Solar Farm - Stage 1.</p>
<p>The post <a href="https://apdeng.com.au/project/solar-farm-commissioning-and-integration-into-sapn-network/">SOLAR FARM COMMISSIONING AND INTEGRATION INTO SAPN NETWORK</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>33KV SWITCHBOARD PMS INTEGRATION</title>
		<link>https://apdeng.com.au/project/33kv-switchboard-pms-integration/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 14 Aug 2019 00:47:15 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6308</guid>

					<description><![CDATA[<p>The Roy Hill Ultrafine Iron Recovery Facility required the repurposing of a 33kV switchboard, originally from the thier Port, integrated into their Mine's PMS.</p>
<p>The post <a href="https://apdeng.com.au/project/33kv-switchboard-pms-integration/">33KV SWITCHBOARD PMS INTEGRATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>POWER LOAD MANAGEMENT CONTROL SYSTEM AND NETWORK UPGRADE</title>
		<link>https://apdeng.com.au/project/power-load-management-control-system-and-network-upgrade/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 31 Oct 2018 06:30:34 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4959</guid>

					<description><![CDATA[<p>APD Engineering was hired to perform design &#038; implementation of the Power Load Management Control System &#038; Network Upgrade.</p>
<p>The post <a href="https://apdeng.com.au/project/power-load-management-control-system-and-network-upgrade/">POWER LOAD MANAGEMENT CONTROL SYSTEM AND NETWORK UPGRADE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>PILGANGOORA LITHIUM POWER STATION FUEL FACILITY CONTROL SYSTEM</title>
		<link>https://apdeng.com.au/project/pilgangoora-lithium-power-station-fuel-facility-control-system/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 31 Oct 2018 04:22:58 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4953</guid>

					<description><![CDATA[<p>APD Engineering delivered the project’s fuel facility control system to the client’s specifications. Also provided support to the power station operators post-delivery.</p>
<p>The post <a href="https://apdeng.com.au/project/pilgangoora-lithium-power-station-fuel-facility-control-system/">PILGANGOORA LITHIUM POWER STATION FUEL FACILITY CONTROL SYSTEM</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>UPGRADE OF OBSOLETE RELAY SUBSTATION AND SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/upgrade-of-obsolete-relay-substation-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 31 Oct 2018 02:10:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4951</guid>

					<description><![CDATA[<p>APD was hired to perform the design and engineering of Secondary, Automation, Communications and Protection in relation to the replacement of the relay substation and SCADA system at Western Terminal, East Perth and Southern Terminal.</p>
<p>The post <a href="https://apdeng.com.au/project/upgrade-of-obsolete-relay-substation-and-scada-design/">UPGRADE OF OBSOLETE RELAY SUBSTATION AND SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		