<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Renewable Energy - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/renewable-energy/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/renewable-energy/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 04:34:05 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Renewable Energy - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/renewable-energy/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/east-rockingham-waste-to-energy-generator-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 06 Feb 2023 02:08:03 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8366</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/east-rockingham-waste-to-energy-generator-grid-connection/">EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/project/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:31:07 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7884</guid>

					<description><![CDATA[<p>APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SOLAR FARM COMMISSIONING AND INTEGRATION INTO SAPN NETWORK</title>
		<link>https://apdeng.com.au/project/solar-farm-commissioning-and-integration-into-sapn-network/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 15 Nov 2019 02:52:08 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6991</guid>

					<description><![CDATA[<p>APD Engineering was engaged by CSI for the detailed design, development, testing, SCADA commissioning &#038; integration into the SAPN network of the Mannum Solar Farm - Stage 1.</p>
<p>The post <a href="https://apdeng.com.au/project/solar-farm-commissioning-and-integration-into-sapn-network/">SOLAR FARM COMMISSIONING AND INTEGRATION INTO SAPN NETWORK</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NORTHAM SOLAR FARM HV SUBMISSION</title>
		<link>https://apdeng.com.au/project/northam-solar-farm-hv-submission/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 05 Sep 2019 05:53:34 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6414</guid>

					<description><![CDATA[<p>APD Engineering was requested by Energy Made Clean to complete a HV submission to satisfy the Western Australian electrical requirements for the Northam solar farm.</p>
<p>The post <a href="https://apdeng.com.au/project/northam-solar-farm-hv-submission/">NORTHAM SOLAR FARM HV SUBMISSION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ALKIMOS COMMUNITY BATTERY STORAGE EARTHING DESIGN AND EPR TESTING</title>
		<link>https://apdeng.com.au/project/alkimos-community-battery-storage-earthing-design-and-epr-testing/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Sep 2017 08:06:35 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2938</guid>

					<description><![CDATA[<p>Earthing Design &#038; EPR Assessment and Step &#038; Touch Measurement.</p>
<p>The post <a href="https://apdeng.com.au/project/alkimos-community-battery-storage-earthing-design-and-epr-testing/">ALKIMOS COMMUNITY BATTERY STORAGE EARTHING DESIGN AND EPR TESTING</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>GULLEN RANGE WIND FARM</title>
		<link>https://apdeng.com.au/project/gullen-range-wind-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Sep 2017 07:12:47 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2935</guid>

					<description><![CDATA[<p>APD Engineering provided Detailed Design and Foundation Assessment for the Gullen Range Wind Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/gullen-range-wind-farm/">GULLEN RANGE WIND FARM</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ARENA FUNDED SOLAR FARMS EARTHING DESIGN &#038; SITE TESTING</title>
		<link>https://apdeng.com.au/project/arena-funded-solar-farms-earthing-design-and-site-testing/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Sep 2017 05:58:36 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2932</guid>

					<description><![CDATA[<p>Soil Testing, Earthing Design, Conductor Sizing, Step &#038; Touch Assessment, Earth Injection Testing.</p>
<p>The post <a href="https://apdeng.com.au/project/arena-funded-solar-farms-earthing-design-and-site-testing/">ARENA FUNDED SOLAR FARMS EARTHING DESIGN &#038; SITE TESTING</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>EMU DOWNS WIND FARM (EDWF) DYNAMIC MODEL BUILD</title>
		<link>https://apdeng.com.au/project/emu-downs-wind-farm-dynamic-model-build/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Sep 2017 05:45:35 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2928</guid>

					<description><![CDATA[<p>Prepare and verify a DIgSILENT PowerFactory dynamic model representing the 80MW Emu Downs site consisting of 48 Vestas Wind Turbine Generators (WTG), substation and interconnection to the 132kV grid.</p>
<p>The post <a href="https://apdeng.com.au/project/emu-downs-wind-farm-dynamic-model-build/">EMU DOWNS WIND FARM (EDWF) DYNAMIC MODEL BUILD</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
