<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Reporting - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/reporting/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/reporting/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 02:02:29 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Reporting - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/reporting/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</title>
		<link>https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 09 Sep 2019 05:20:31 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6437</guid>

					<description><![CDATA[<p>APD Engineering conducted detailed earthing studies as per AS/NZS 4853:2012 including; EPR, LFI and EMF hazard assessments as well as review of proposed cathodic protection and other gas pipeline ancillary services (below and above ground). Site testing works were also undertaken to validate the detailed CDEGS modelling results.</p>
<p>The post <a href="https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/">GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>TRANSFORMER HARMONIC AND RESONANCE STUDIES</title>
		<link>https://apdeng.com.au/project/transformer-harmonic-and-resonance-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 06 Sep 2019 04:33:34 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6421</guid>

					<description><![CDATA[<p>APD Engineering was requested by an Australian utility to assess voltage and current harmonic and resonance analysis studies for two 220/132/22kV 120/140MVA transformer with respect to limits set out in IEC 61000:3:6 (2012).</p>
<p>The post <a href="https://apdeng.com.au/project/transformer-harmonic-and-resonance-studies/">TRANSFORMER HARMONIC AND RESONANCE STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NORTHAM SOLAR FARM HV SUBMISSION</title>
		<link>https://apdeng.com.au/project/northam-solar-farm-hv-submission/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 05 Sep 2019 05:53:34 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6414</guid>

					<description><![CDATA[<p>APD Engineering was requested by Energy Made Clean to complete a HV submission to satisfy the Western Australian electrical requirements for the Northam solar farm.</p>
<p>The post <a href="https://apdeng.com.au/project/northam-solar-farm-hv-submission/">NORTHAM SOLAR FARM HV SUBMISSION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MT WHALEBACK SUBSTATION PLANT REPLACEMENT</title>
		<link>https://apdeng.com.au/project/mt-whaleback-substation-plant-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 03 Oct 2018 07:11:09 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4789</guid>

					<description><![CDATA[<p>66kV Mt Whaleback Substation Plant Replacement.</p>
<p>The post <a href="https://apdeng.com.au/project/mt-whaleback-substation-plant-replacement/">MT WHALEBACK SUBSTATION PLANT REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>REMOTE ABORIGINAL COMMUNITIES</title>
		<link>https://apdeng.com.au/project/remote-aboriginal-communities/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 26 Sep 2018 07:02:17 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4749</guid>

					<description><![CDATA[<p>Provide network and power station capacity upgrades to remote aboriginal communities.</p>
<p>The post <a href="https://apdeng.com.au/project/remote-aboriginal-communities/">REMOTE ABORIGINAL COMMUNITIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</title>
		<link>https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 14 Aug 2018 02:55:54 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4481</guid>

					<description><![CDATA[<p>33kV Junction Capacitor circuit breaker, CT and controller replacement.</p>
<p>The post <a href="https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/">33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RANGEWAY SUBSTATION THIRD TRANSFORMER</title>
		<link>https://apdeng.com.au/project/rangeway-substation-third-transformer/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 03 Aug 2018 05:09:14 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4442</guid>

					<description><![CDATA[<p>APD were engaged by Western Power to complete detailed design &#038; drafting for the new transformer circuit &#038; switchroom at the Rangeway substation, Geraldton, WA</p>
<p>The post <a href="https://apdeng.com.au/project/rangeway-substation-third-transformer/">RANGEWAY SUBSTATION THIRD TRANSFORMER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MARRIOTT ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/marriott-road-substation-communications-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 06:23:52 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4356</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/marriott-road-substation-communications-and-scada-design/">MARRIOTT ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>MASON ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</title>
		<link>https://apdeng.com.au/project/mason-road-substation-communications-and-scada-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 06:02:07 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4353</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/mason-road-substation-communications-and-scada-design/">MASON ROAD SUBSTATION COMMUNICATIONS &#038; SCADA DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WANGARA SUBSTATION SCADA AND COMMUNICATIONS</title>
		<link>https://apdeng.com.au/project/wangara-substation-scada-and-communications/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Jun 2018 04:36:42 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4350</guid>

					<description><![CDATA[<p>Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.</p>
<p>The post <a href="https://apdeng.com.au/project/wangara-substation-scada-and-communications/">WANGARA SUBSTATION SCADA AND COMMUNICATIONS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
