ALINTA LINE RECONFIGURATION SECONDARY SCOPE
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
APD has been engaged to provide full electrical engineering, project management and as built detailing for the Canterbury Rd Braeside industrial Estate.
Tom Price Transmission Tower: APD were engaged by Rio Tinto & Powerlines Plus to conduct detailed designs for the replacement of a damaged tower in WA
APD were engaged by Rio Tinto requiring 3 sections of overhead power lines to be undergrounded to allow for new haul roads to be constructed. After field data collection, we completed the power line modelling to AS7000 and Rio Tinto’s specifications for new and existing poles and towers. APD also provided detailed designs for structures, foundations, line profiles, earthing and more.