ALINTA LINE RECONFIGURATION SECONDARY SCOPE
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
APD were engaged to perform detailed design and development integrating the conveyor emergency stop system into the plant Process Control System. BHP Billiton Iron Ore had identified the need to replace the existing conveyor emergency stop modules at their Area C mine. APD saw the project through from development and design to construction supervision, testing and commissioning.