UPGRADE OF MC254 OVERLAND CONVEYOR EMERGENCY STOP SYSTEM

APD were engaged to perform detailed design and development integrating the conveyor emergency stop system into the plant Process Control System. BHP Billiton Iron Ore had identified the need to replace the existing conveyor emergency stop modules at their Area C mine. APD saw the project through from development and design to construction supervision, testing and commissioning.

NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION

APD were consulted by Rio Tinto’s Nammuldi Agricultural Project when facing challenges with their Pivot Control System. After an assessment of the existing infrastructure APD developed a design that not only improved the system but simplified it, making it practical and cost effective. APD also conducted the testing, construction and commissioning of the project.