APD were consulted by Rio Tinto’s Nammuldi Agricultural Project when facing challenges with their Pivot Control System. After an assessment of the existing infrastructure APD developed a design that not only improved the system but simplified it, making it practical and cost effective. APD also conducted the testing, construction and commissioning of the project.
![Nammuldi Agricultural Project](https://apdeng.com.au/wp-content/uploads/2017/10/Nammuldi-Agricultural-Project.jpg)