<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Earthing Design - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/earthing-design/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/earthing-design/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 02:02:29 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Earthing Design - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/earthing-design/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>TALLAWARRA B GRID CONNECTION</title>
		<link>https://apdeng.com.au/project/tallawarra-b-grid-connection/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 15 Jun 2021 04:45:51 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7948</guid>

					<description><![CDATA[<p>APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network &#038; determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.</p>
<p>The post <a href="https://apdeng.com.au/project/tallawarra-b-grid-connection/">TALLAWARRA B GRID CONNECTION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/project/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:31:07 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7884</guid>

					<description><![CDATA[<p>APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</title>
		<link>https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 09 Sep 2019 05:20:31 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6437</guid>

					<description><![CDATA[<p>APD Engineering conducted detailed earthing studies as per AS/NZS 4853:2012 including; EPR, LFI and EMF hazard assessments as well as review of proposed cathodic protection and other gas pipeline ancillary services (below and above ground). Site testing works were also undertaken to validate the detailed CDEGS modelling results.</p>
<p>The post <a href="https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/">GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NORTHAM SOLAR FARM HV SUBMISSION</title>
		<link>https://apdeng.com.au/project/northam-solar-farm-hv-submission/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 05 Sep 2019 05:53:34 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6414</guid>

					<description><![CDATA[<p>APD Engineering was requested by Energy Made Clean to complete a HV submission to satisfy the Western Australian electrical requirements for the Northam solar farm.</p>
<p>The post <a href="https://apdeng.com.au/project/northam-solar-farm-hv-submission/">NORTHAM SOLAR FARM HV SUBMISSION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WASTEWATER TREATMENT PLANT EARTHING AND LIGHTNING PROTECTION TESTING</title>
		<link>https://apdeng.com.au/project/wastewater-treatment-plant-earthing-and-lightning-protection-testing/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 19 Mar 2019 05:56:18 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=5330</guid>

					<description><![CDATA[<p>Visual inspection and testing of the lightning protection, earthing and bonding systems for the Point Lookout Wastewater Treatment Plant. The project came about due to multiple instrument and electric motor failures, attributed to insufficient earthing of the instruments.</p>
<p>The post <a href="https://apdeng.com.au/project/wastewater-treatment-plant-earthing-and-lightning-protection-testing/">WASTEWATER TREATMENT PLANT EARTHING AND LIGHTNING PROTECTION TESTING</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>EATON APARTMENTS CHAMBER SUBSTATION DESIGN</title>
		<link>https://apdeng.com.au/project/eaton-apartments-chamber-substation-design/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 28 Nov 2018 06:38:04 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=5015</guid>

					<description><![CDATA[<p>APD Engineering were engaged to provide a certified electrical design for supply of Eaton Apartments in Wickham, Newcastle. A chamber substation was selected due to apparent space restrictions to site. Liaison with client, architect, structural engineers and site electricians was part of the process used to develop the final solution.</p>
<p>The post <a href="https://apdeng.com.au/project/eaton-apartments-chamber-substation-design/">EATON APARTMENTS CHAMBER SUBSTATION DESIGN</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SUBSTATION INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/project/substation-insulation-coordination-and-reactor-switching-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 21 Aug 2018 03:58:38 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4492</guid>

					<description><![CDATA[<p>APD Engineering was engaged to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a href="https://apdeng.com.au/project/substation-insulation-coordination-and-reactor-switching-studies/">SUBSTATION INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</title>
		<link>https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 14 Aug 2018 02:55:54 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4481</guid>

					<description><![CDATA[<p>33kV Junction Capacitor circuit breaker, CT and controller replacement.</p>
<p>The post <a href="https://apdeng.com.au/project/33kv-junction-capacitor-circuit-breaker-and-ct-replacement/">33KV JUNCTION CAPACITOR CIRCUIT BREAKER AND CT REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>RANGEWAY SUBSTATION THIRD TRANSFORMER</title>
		<link>https://apdeng.com.au/project/rangeway-substation-third-transformer/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 03 Aug 2018 05:09:14 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4442</guid>

					<description><![CDATA[<p>APD were engaged by Western Power to complete detailed design &#038; drafting for the new transformer circuit &#038; switchroom at the Rangeway substation, Geraldton, WA</p>
<p>The post <a href="https://apdeng.com.au/project/rangeway-substation-third-transformer/">RANGEWAY SUBSTATION THIRD TRANSFORMER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>DISTRIBUTION NETWORK ANALYSIS &#038; LINE DESIGN SERVICES</title>
		<link>https://apdeng.com.au/project/distribution-network-analysis-line-design-services/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 05 Jul 2018 05:15:45 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4395</guid>

					<description><![CDATA[<p>APD were engaged by Essential Energy to complete large packages of reinforcement works as part of their network maintenance. This included both overhead and underground design packages all over NSW.</p>
<p>The post <a href="https://apdeng.com.au/project/distribution-network-analysis-line-design-services/">DISTRIBUTION NETWORK ANALYSIS &#038; LINE DESIGN SERVICES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
