ALINTA LINE RECONFIGURATION SECONDARY SCOPE
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network.
APD Engineering were engaged by BHP to deliver a Class 4 Desktop-level Cost Estimate (Turnkey delivery model) for two identified sites. Once an option was agreed APD produced a detailed design package for installation of the capacitor bank. The detailed design package included primary, civil and secondary design.
APD was contracted by BHP Iron Ore to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and Orebody (OB18). Based on the client’s drawing, specifications and documentation APD prepared detail designs, executed the integration and completed the project.
APD were engaged to perform detailed design and development integrating the conveyor emergency stop system into the plant Process Control System. BHP Billiton Iron Ore had identified the need to replace the existing conveyor emergency stop modules at their Area C mine. APD saw the project through from development and design to construction supervision, testing and commissioning.
APD were commissioned to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System at BHP Billiton Iron Ore Yandi Mine.
APD undertook the design to BHP requirements; automated processes development, testing and commissioning; construction support; site commissioning and project delivery.