OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM

OPERATION CENTRE AEO CERTIFICATION FOR EARTHING SYSTEM

APD were engaged by Sydney Trains Construction Contractor, an Accredited Engineering Organisation (AEO) with earthing expertise, to provide assurance services for the earthing installation of the new Railway Operation Centre (ROC). ROC will form a critical part of the Sydney trains infrastructure, as the main hub for system controls, incident response and customer service.

NEWMAN POWER TO TOWNSHIP LINE RECONFIGURATION

YARNIMA SUBSTATION TO NEWMAN TOWNSHIP LINE RECONFIGURATION

Southern Cross Electrical Engineering (SCEE) engaged APD to do power line modelling and design for the 66kv reconfiguration outside of Yarnima Substation to the Newman township. We completed a field inspection determining the reconfiguration required additional poles and modification of loads to existing poles and towers be reassessed. APD then provided cost effective design solutions for the new power poles and modifications to the existing power poles and towers.

WHEELARA & OREBODY 18 (OB18) VENT FANS VSD REPLACEMENT

APD was contracted by BHP Iron Ore to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and Orebody (OB18). Based on the client’s drawing, specifications and documentation APD prepared detail designs, executed the integration and completed the project.