CHICHESTER SOLAR FARM OWNER’S ENGINEER

APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm. The Chichester Solar Project consisted of a 60MW solar PV power station located in the Pilbara region. The project also included 64km of 220kV transmission line, two new 220kV substations at Christmas Creek and Cloudbreak and an expansion…

NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION

APD were consulted by Rio Tinto’s Nammuldi Agricultural Project when facing challenges with their Pivot Control System. After an assessment of the existing infrastructure APD developed a design that not only improved the system but simplified it, making it practical and cost effective. APD also conducted the testing, construction and commissioning of the project.