ULTRALINK REPLACEMENT PROJECT
Replacement of Ultralink services at several regional WA substations with UHF radio links to existing Western Power sites.
APD Engineering offers a full suite of services to assist with the planning and development of telecommunications network infrastructure. The type of infrastructure we support include backbone networks based on radio, fibre, copper, as well as fail-safe systems and associated support systems. Our service offering ranges from providing advice on network implementation and modernization, detailed engineering, to site support for commissioning activities.
A telecommunications network forms the critical backbone of many industries and assists in operation, fault finding, trending and planning. It is critical to the functioning of mission critical systems ranging from protection systems in electrical network to telephony and data highways in ICT systems.
The selection of the communications architecture is essential to provide a scalable solution for future growth. Our selection of equipment and design of network topology provides a scalable design for future network expansion. Some of our core capabilities are listed in below.
Replacement of Ultralink services at several regional WA substations with UHF radio links to existing Western Power sites.
Detailed design of communication circuit rearrangement as part of an East Perth disaster recovery process.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
As part of relocating Western Power’s electrical network control centre, APD Engineering were engaged to do design and drafting for upgrades to the telecommunication infrastructure…
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for new 132/22kV Transformer and switchroom project.