MAC TLO WORKING PLATFORM SLIDING GATE CONTROL INTEGRATION
APD Engineering was hired to perform the control system integration of the MAC TLO Working Platform Sliding Gate.
APD have complete controls, communications, electrical and instrumentation capability that complement our broader electrical power & civil engineering services. We provide services to the mining, oil & gas, infrastructure and power generation sectors utilising our team of qualified, experienced E&I personnel.
APD Engineering was hired to perform the control system integration of the MAC TLO Working Platform Sliding Gate.
66kV Mt Whaleback Substation Plant Replacement.
33kV Junction Capacitor circuit breaker, CT and controller replacement.
APD were engaged by Western Power to complete detailed design & drafting for the new transformer circuit & switchroom at the Rangeway substation, Geraldton, WA
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for new 132/22kV Transformer and switchroom project.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.