TALLAWARRA B GRID CONNECTION

APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study & assess the local network & determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station. It will be Australia’s first net-zero emissions plant, which will use…