<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Construction Management - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/construction-management/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/construction-management/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 04:30:15 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Construction Management - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/construction-management/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</title>
		<link>https://apdeng.com.au/project/chichester-solar-farm/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 11 Jan 2021 08:31:07 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7884</guid>

					<description><![CDATA[<p>APD Engineering were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm.</p>
<p>The post <a href="https://apdeng.com.au/project/chichester-solar-farm/">CHICHESTER SOLAR FARM OWNER&#8217;S ENGINEER</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>BALGO NETWORK &#038; POWER STATION UPGRADE</title>
		<link>https://apdeng.com.au/project/balgo-network-and-power-station-upgrade/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 06 Nov 2017 06:52:16 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3811</guid>

					<description><![CDATA[<p>Engineering, Procurement and Construction Management (EPCM).</p>
<p>The post <a href="https://apdeng.com.au/project/balgo-network-and-power-station-upgrade/">BALGO NETWORK &#038; POWER STATION UPGRADE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SHELL FUEL DEPOT POWER SUPPLY UPGRADE</title>
		<link>https://apdeng.com.au/project/shell-fuel-depot-power-supply-upgrade/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 25 Oct 2017 07:40:22 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3587</guid>

					<description><![CDATA[<p>Engineering, Procurement and Construction (EPC).</p>
<p>The post <a href="https://apdeng.com.au/project/shell-fuel-depot-power-supply-upgrade/">SHELL FUEL DEPOT POWER SUPPLY UPGRADE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>CALTEX CONVENIENCE STORE POWER SUPPLY</title>
		<link>https://apdeng.com.au/project/caltex-convenience-store-power-supply/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 25 Oct 2017 05:44:25 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3572</guid>

					<description><![CDATA[<p>Engineering, Procurement and Construction (EPC).</p>
<p>The post <a href="https://apdeng.com.au/project/caltex-convenience-store-power-supply/">CALTEX CONVENIENCE STORE POWER SUPPLY</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION</title>
		<link>https://apdeng.com.au/project/nammuldi-agricultural-project-pivot-control-system-simplification/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 23 Oct 2017 05:14:27 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3486</guid>

					<description><![CDATA[<p>Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.</p>
<p>The post <a href="https://apdeng.com.au/project/nammuldi-agricultural-project-pivot-control-system-simplification/">NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>YANDI MINE POTABLE WATER SUPPLY</title>
		<link>https://apdeng.com.au/project/yandi-mine-potable-water-supply/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 23 Oct 2017 05:00:18 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3481</guid>

					<description><![CDATA[<p>APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.</p>
<p>The post <a href="https://apdeng.com.au/project/yandi-mine-potable-water-supply/">YANDI MINE POTABLE WATER SUPPLY</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>UPGRADE OF MC254 OVERLAND CONVEYOR EMERGENCY STOP SYSTEM</title>
		<link>https://apdeng.com.au/project/upgrade-of-mc254-overland-conveyor-emergency-stop-system/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 20 Oct 2017 00:45:57 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3414</guid>

					<description><![CDATA[<p>APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.</p>
<p>The post <a href="https://apdeng.com.au/project/upgrade-of-mc254-overland-conveyor-emergency-stop-system/">UPGRADE OF MC254 OVERLAND CONVEYOR EMERGENCY STOP SYSTEM</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>WHEELARA &#038; OREBODY 18 (OB18) VENT FANS VSD REPLACEMENT</title>
		<link>https://apdeng.com.au/project/wheelara-and-orebody-18-vent-fans-vsd-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 19 Oct 2017 02:08:40 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3362</guid>

					<description><![CDATA[<p>APD was hired to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and OB18.</p>
<p>The post <a href="https://apdeng.com.au/project/wheelara-and-orebody-18-vent-fans-vsd-replacement/">WHEELARA &#038; OREBODY 18 (OB18) VENT FANS VSD REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>GREAT EASTERN HIGHWAY ASSET RELOCATION</title>
		<link>https://apdeng.com.au/project/great-eastern-highway-asset-relocation/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 22 Sep 2017 01:18:13 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2903</guid>

					<description><![CDATA[<p>To provide distribution design services for relocation of Western Power Overhead and Underground High Voltage (22kV) and Low Voltage infrastructure along a 4.2km section of Great Eastern Highway.</p>
<p>The post <a href="https://apdeng.com.au/project/great-eastern-highway-asset-relocation/">GREAT EASTERN HIGHWAY ASSET RELOCATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>VALES PT SWITCHBOARD REPLACEMENT</title>
		<link>https://apdeng.com.au/project/vales-pt-switchboard-replacement/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 18 Sep 2017 08:47:09 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=2735</guid>

					<description><![CDATA[<p>Complete design, procurement, testing and construction management for the replacement of an existing 6.6kV Switchboard. Existing switchboard was split into separate boards with a total of 25 panels. All works were carried out within a brownfield powerstation environment with limits on outages and construction schedules.</p>
<p>The post <a href="https://apdeng.com.au/project/vales-pt-switchboard-replacement/">VALES PT SWITCHBOARD REPLACEMENT</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
