APD is one of the leading HV Substation design companies in Australia with an experienced in-house team providing the range of required services nationally. Our veteran staff have successfully delivered over 100 (GIS & Non GIS) substation projects for voltages up to 500kV.

SNAPPER POINT CONNECTION

CLIENT: Enerven / ElectraNet LOCATION: Adelaide, SA. SCOPE: APD Engineering was engaged by Enerven / Electranet to produce the Detail Design of 275/66kV Substation at Snapper Point and 275kV Transmission Line Design between Snapper Point and Pelican Point substations. TECHNICAL SITUATION TNU initiated developing the Snapper Point Power Station at Harbor, SA and the works…

UNIT ASSET REPLACEMENT (UAR) PROJECT

CLIENT: Enerven / ElectraNet LOCATION: Adelaide, SA. SCOPE: APD Engineering was engaged by Enerven to produce the design for ElectraNet’s Unit Asset Replacement project at five of their substations. TECHNICAL SITUATION ElectraNet initiated a Unit Asset Replacement (UAR) for the regulatory period 2018-2023 involving substation asset replacement, namely; circuit breakers, isolators, surge arrestors, voltage transformers,…

TALLAWARRA B GRID CONNECTION

APD Engineering was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network & determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.

EATON APARTMENTS CHAMBER SUBSTATION DESIGN

APD Engineering were engaged to provide a certified electrical design for supply of Eaton Apartments in Wickham, Newcastle. A chamber substation was selected due to apparent space restrictions to site. Liaison with client, architect, structural engineers and site electricians was part of the process used to develop the final solution.