APD works with Water Industry service providers and asset owners to deliver electrical, instrumentation and control engineering solutions that are aimed at improving and truly transforming system performance.
The global focus on water management coupled with aging assets is a driver for innovative asset management at competitive prices. APD aims to assist the Client in delivery of these objectives and maintain focus on the end users .
Visual inspection and testing of the lightning protection, earthing and bonding systems for the Point Lookout Wastewater Treatment Plant. The project came about due to multiple instrument and electric motor failures, attributed to insufficient earthing of the instruments.
APD were engaged by UGL to perform the testing and commissioning of the HV protection relays on the Tomago town water supply plant.
Powerline Design, Power System Studies & cable/conductor selection, Protection Grading, Earthing Design & Site Testing.
APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.
Soil testing, detailed EPR/LFI study, earthing design and injection testing.