<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Modelling - APD Engineering</title>
	<atom:link href="https://apdeng.com.au/project-category/modelling/feed/" rel="self" type="application/rss+xml" />
	<link>https://apdeng.com.au/project-category/modelling/</link>
	<description>APD Engineering: 20+ Years Experience – Specialists in Utility Engineering</description>
	<lastBuildDate>Tue, 23 Jan 2024 04:42:47 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://apdeng.com.au/wp-content/uploads/2017/07/cropped-APD_logo_BLUE_Flav_32x32px-32x32.gif</url>
	<title>Modelling - APD Engineering</title>
	<link>https://apdeng.com.au/project-category/modelling/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Generation Compliance Testing &#038; Model Validation</title>
		<link>https://apdeng.com.au/project/generation-compliance-testing-and-model-validation/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Fri, 06 Aug 2021 07:29:59 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=8005</guid>

					<description><![CDATA[<p>The post <a href="https://apdeng.com.au/project/generation-compliance-testing-and-model-validation/">Generation Compliance Testing &#038; Model Validation</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>PERNATTY SUBSTATION ELECTROMAGNETIC FIELDS (EMF) STUDY</title>
		<link>https://apdeng.com.au/project/pernatty-substation-electromagnetic-fields-study/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 11 Feb 2020 07:09:15 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7541</guid>

					<description><![CDATA[<p>APD Engineering conducted an Electromagnetic Fields (EMF) Study of Pernatty substation in South Australia for human health considerations.</p>
<p>The post <a href="https://apdeng.com.au/project/pernatty-substation-electromagnetic-fields-study/">PERNATTY SUBSTATION ELECTROMAGNETIC FIELDS (EMF) STUDY</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Titanium Dioxide Plant HV Distribution Upgrade</title>
		<link>https://apdeng.com.au/project/titanium-dioxide-plant-hv-distribution-upgrade/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 30 Jan 2020 03:44:23 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=7463</guid>

					<description><![CDATA[<p>APD Engineering undertook power system studies, arc flash and protection scheme design associated with new 22kV HV Switchboards and 415V LV Switchboards as part of the Australind Titanium Dioxide Plant HV Distribution Upgrade.</p>
<p>The post <a href="https://apdeng.com.au/project/titanium-dioxide-plant-hv-distribution-upgrade/">Titanium Dioxide Plant HV Distribution Upgrade</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</title>
		<link>https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 09 Sep 2019 05:20:31 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=6437</guid>

					<description><![CDATA[<p>APD Engineering conducted detailed earthing studies as per AS/NZS 4853:2012 including; EPR, LFI and EMF hazard assessments as well as review of proposed cathodic protection and other gas pipeline ancillary services (below and above ground). Site testing works were also undertaken to validate the detailed CDEGS modelling results.</p>
<p>The post <a href="https://apdeng.com.au/project/gas-pipeline-epr-lfi-emf-assessments/">GAS PIPELINE EPR, LFI and EMF ASSESSMENTS</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>SUBSTATION INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</title>
		<link>https://apdeng.com.au/project/substation-insulation-coordination-and-reactor-switching-studies/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 21 Aug 2018 03:58:38 +0000</pubDate>
				<guid isPermaLink="false">https://apdeng.com.au/?post_type=dt_portfolio&#038;p=4492</guid>

					<description><![CDATA[<p>APD Engineering was engaged to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.</p>
<p>The post <a href="https://apdeng.com.au/project/substation-insulation-coordination-and-reactor-switching-studies/">SUBSTATION INSULATION COORDINATION AND REACTOR SWITCHING STUDIES</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ALINTA LINE RECONFIGURATION SECONDARY SCOPE</title>
		<link>https://apdeng.com.au/project/alinta-line-reconfiguration-secondary-scope/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Tue, 12 Jun 2018 06:12:29 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4291</guid>

					<description><![CDATA[<p>Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.</p>
<p>The post <a href="https://apdeng.com.au/project/alinta-line-reconfiguration-secondary-scope/">ALINTA LINE RECONFIGURATION SECONDARY SCOPE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>NEWMAN POWER TO TOWNSHIP LINE RECONFIGURATION</title>
		<link>https://apdeng.com.au/project/newman-power-to-township-line-reconfiguration/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Wed, 28 Mar 2018 05:16:20 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4152</guid>

					<description><![CDATA[<p>Power line modelling and Design for the 66kv reconfiguration outside of Yarnima Substation.</p>
<p>The post <a href="https://apdeng.com.au/project/newman-power-to-township-line-reconfiguration/">NEWMAN POWER TO TOWNSHIP LINE RECONFIGURATION</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>COMPUTER MODELLING &#038; POWER SYSTEM STUDIES FOR FQM NICKEL MINE</title>
		<link>https://apdeng.com.au/project/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 12 Mar 2018 03:38:53 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=4125</guid>

					<description><![CDATA[<p>APD's Power System Studies team provided First Quantum Minerals (FQM) with end-to-end services from detailed site survey (data collection), to computer modelling and system analyses. With a model of the mine network, FQM can investigate various contingency events &#038; plan for the most cost-effective network utilization.</p>
<p>The post <a href="https://apdeng.com.au/project/computer-modelling-and-power-system-studies-for-fqm-nickel-mine/">COMPUTER MODELLING &#038; POWER SYSTEM STUDIES FOR FQM NICKEL MINE</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>COFFS HARBOUR FSAM1</title>
		<link>https://apdeng.com.au/project/coffs-harbour-fsam-1/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Mon, 23 Oct 2017 07:40:47 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3524</guid>

					<description><![CDATA[<p>Field Survey and Data Collection, Fibre Optic Detailed Design.</p>
<p>The post <a href="https://apdeng.com.au/project/coffs-harbour-fsam-1/">COFFS HARBOUR FSAM1</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>ARC FLASH ASSESSMENT FOR THE KIOSK SUB &#038; LV DISTRIBUTION BOARDS (DBs)</title>
		<link>https://apdeng.com.au/project/arc-flash-assessment-for-the-kiosk-sub-and-lv-distribution-boards/</link>
		
		<dc:creator><![CDATA[Remi Harasz]]></dc:creator>
		<pubDate>Thu, 19 Oct 2017 06:35:00 +0000</pubDate>
				<guid isPermaLink="false">http://apdeng.com.au/?post_type=dt_portfolio&#038;p=3404</guid>

					<description><![CDATA[<p>Protection grading assessment, Arc flash hazard investigation, and Risk mitigation measures.</p>
<p>The post <a href="https://apdeng.com.au/project/arc-flash-assessment-for-the-kiosk-sub-and-lv-distribution-boards/">ARC FLASH ASSESSMENT FOR THE KIOSK SUB &#038; LV DISTRIBUTION BOARDS (DBs)</a> appeared first on <a href="https://apdeng.com.au">APD Engineering</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
