ALINTA LINE RECONFIGURATION SECONDARY SCOPE
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.
APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.
APD was hired to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and OB18.