MINING AREA C GROWTH REACTIVE SUPPORT
Concept design, detailed design for installation of 10MVAR of reactive support for Mining Area C.
APD is one of the leading HV Substation design companies in Australia with an experienced in-house team providing the range of required services nationally. Our veteran staff have successfully delivered over 100 (GIS & Non GIS) substation projects for voltages up to 500kV.
Concept design, detailed design for installation of 10MVAR of reactive support for Mining Area C.
Engineering, Procurement and Construction (EPC).
Protection grading assessment, Arc flash hazard investigation, and Risk mitigation measures.
Site Inspection, Earthing Design & Drawings, EPR Hazard Assessment on 3rd Party Assets, Current Injection Testing.
Assess the power network infrastructure for new Aboriginal and Government Regional Officer Housing connections for regulated and non-regulated communities as part of the 2012-14 Housing Program.
Complete design, procurement, testing and construction management for the replacement of an existing 6.6kV Switchboard. Existing switchboard was split into separate boards with a total of 25 panels. All works were carried out within a brownfield powerstation environment with limits on outages and construction schedules.
Develop the primary, civil,structural and secondary, SCADA and Communications design for a new transformer and switchboard, new switchroom at Wedgefield Substation.
APD was hired to perform detailed design and commissioning for the replacement of 66 kV Oil Circuit Breakers (OCB’s) at 5 different substations around Newman.