APD Engineering were engaged by BHP to deliver a Class 4 Desktop-level Cost Estimate (Turnkey delivery model) for two identified sites. Once an option was agreed APD produced a detailed design package for installation of the capacitor bank. The detailed design package included primary, civil and secondary design.