APD were engaged by the CSIRO to conduct Power System Studies, Protection Grading Analysis, Earthing System Design & Site Testing and prepare the HV Submission for the Network Operator, Horizon Power.READ MORE Post navigationPreviousPrevious post:APD PROUD TO ANNOUNCE THEY ARE THE PLATINUM SPONSORS OF EECONNextNext post:PERTH CBD ZONE SUBSTATIONS EARTHING DESIGN & TESTINGRelated PostsAPD ENGINEERING IS PROUD TO ANNOUNCE OUR APPOINTMENT TO THE TRANSPOWER LINES FULL DESIGN PANEL!16/04/2024OUR FIRST LEO SATELLITE BACKHAUL MIGRATION SITE – WELL DONE & THANK YOU!20/02/2024GENERATOR PERFORMANCE STANDARD (GPS) REGISTRATION WITH AEMO!23/01/2024BHP NPI INLAND HV SCADA UPGRADE17/11/2023EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION06/02/2023STATE-OF-THE-ART ‘LAB’ NOW A 60 SQUARE METRE TESTING ENVIRONMENT07/12/2022
APD ENGINEERING IS PROUD TO ANNOUNCE OUR APPOINTMENT TO THE TRANSPOWER LINES FULL DESIGN PANEL!16/04/2024