The Pluto Solar Import Project will incorporate a 50 MW Solar Farm at Maitland Strategic Industrial Estate (Maitland), a Transmission and Distribution system from the Solar Farm to the Pluto LNG Park and the additions and modifications at the Pluto site to allow the import of external power into the auxiliary power grid, displacing some of the GTG load and fuel gas usage.
Woodside engaged APD Engineering to provide the integrated control system definition for the Pluto Solar Import Study.