TOMAGO TOWN WATER SUPPLY PLANT
APD were engaged by UGL to perform the testing and commissioning of the HV protection relays on the Tomago town water supply plant.
APD is one of the leading HV Substation design companies in Australia with an experienced in-house team providing the range of required services nationally. Our veteran staff have successfully delivered over 100 (GIS & Non GIS) substation projects for voltages up to 500kV.
APD were engaged by UGL to perform the testing and commissioning of the HV protection relays on the Tomago town water supply plant.
66kV Mt Whaleback Substation Plant Replacement.
APD Engineering was engaged by BHP Iron Ore to provide HV Testing, Commissioning, Engineering Support & Design Revisions for their Jimblebar Mine Expansion.
Provide network and power station capacity upgrades to remote aboriginal communities.
APD Engineering was engaged to provide a SCADA Definition Phase Study for BHP’s Yandi and Junction substations – critical NPI HV assets
APD Engineering was engaged to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.
33kV Junction Capacitor circuit breaker, CT and controller replacement.
APD were engaged by Western Power to complete detailed design & drafting for the new transformer circuit & switchroom at the Rangeway substation, Geraldton, WA
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
Development of the electrical, SCADA and communications design for the a new 66/11kV Substation.