APD Engineering were contracted by PLP to engineer and design three new 1.5MVA and one 1MVA 11/0.433kV kiosk substations, powerline modifications and power and fibre optic cable reticulation for Rio Tinto Iron Ore’s Wickham Accommodation Expansion.
APD Engineering were contracted by PLP to engineer and design three new 1.5MVA and one 1MVA 11/0.433kV kiosk substations, powerline modifications and power and fibre optic cable reticulation for Rio Tinto Iron Ore’s Wickham Accommodation Expansion.