WALLERAWANG AIR INSULATED SUBSTATION COMMISSIONING
132kV & 66kV Substation Testing & Commissioning (Primary, Secondary & SCADA).
APD provide a complete range of on-site field testing and commissioning services for power infrastructure. APD also offer tailored field engineering solutions and other niche services. For example, network audits, performance studies, troubleshooting and investigative support services.
132kV & 66kV Substation Testing & Commissioning (Primary, Secondary & SCADA).
Engineering, Procurement and Construction Management (EPCM).
Powerline Design, Power System Studies & cable/conductor selection, Protection Grading, Earthing Design & Site Testing.
Protection relay testing and commissioning as well as training support.
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.
APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.
Power System Studies, Protection Grading Analysis, Earthing System Design & Site Testing.
Site Inspection, Earthing Design & Drawings, EPR Hazard Assessment on 3rd Party Assets, Current Injection Testing.
APD was hired to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and OB18.