CLIENT: BHP Billiton Iron Ore (BHPBIO)
LOCATION: Mine Area C,Pilbara, WA
SCOPE:
Perform the control system integration of the MAC TLO Working Platform Sliding Gate.
TECHNICAL SITUATION
As part of the work to upgrade the TLO Bin at MAC, a new sliding work platform was being installed. As part of the work, control system modifications are required to be made to achieve the specified level of functionality.
APD Engineering was hired to perform these modifications and integrate the new equipment into the existing site control system.
SERVICES PROVIDED
- PLC & SCADA Development;
- Site Testing & Commissioning.