![18739 - 132_66](https://apdeng.com.au/wp-content/uploads/2017/10/Transmission-Assessment.jpg)
CLIENT: ACTEWAGL / ZINFRA
LOCATION: Canberra, ACT.
SCOPE:
Field Survey, Line Assessment Tower Design & Pole Design.
TECHNICAL SITUATION
APD were required to:
- Complete field survey;
- Calculate conductor tensions;
- Design OPGW connection to ensure clearances are maintained;
- Assess strength of existing towers & poles in PLS TOWER & PLS POLE;
- Assess the impact of the additional load from the OPGW;
- Provide engineering solutions to reinforce tower member s where the load exceeded the strength rating.
SERVICES PROVIDED
- Field assessments and survey;
- Concept design and options report;
- PLS CADD, PLS POLE & PLS TOWER Design;
- Design and Drafting Services;
- NPER Certification.